• All the tiles must be checked prior to fixing for quality, batch no. and choice.
  • Plaster the surface of the floor to be tiled & allow curing at least TWO weeks before tiling.
  • While fixing pick tiles from various boxes alternatively, lay them in the desired patterns & make sure that they give an acceptable blend of colour and design. Please note that shade variation is inherent in manufacturing of tiles.
  • For fixing tiles we recommend to use tile fixing adhesives or equivalent product for the best result.
  • For fixing tiles on floor using conventional method, we suggest the following laying instruction: a. Use cement and sand mortar in the ratio of 1:4. Add water to create a consistent paste. b. Apply 20-25MM of bedding materials over the floor area of 1.0SQM at a time. c. Apply a thin coat of the slurry on the back of the tile to ensure proper & full bedding. Press gently for even adherence of the tiles with surface. Do not use any heavy materials or iron hammer to press tile.
  • For fixing the tools on Dado, we recommend the use of adhesive or equivalent materials.
  • Allow 3-4 days of bed curing after laying tiles & later fill the joint with grout.
  • We recommend maintaining a joint gap of 1-2mm between the tiles to allow possible thermal expansion at later stage.
  • Please note that company will not accept any liability in case of problem arising out of adherence of above fixing instruction.